Peak Rail

The team have been helping Peak Rail recently, initially with a rapid response inspection of the structure following the recent flooding. Thankfully this bridge is one that the team assessed previously, so have good prior knowledge with the structure, its condition and the way it behaves.

In the coming week’s we’ll be working on the design and installation of repairs to ensure the Bridge remains open during the critical Santa Train period, making sure the many children (and adults) who are planning to ride the Santa Train will still get to meet Santa in the run up to Christmas!

If you have had similar incidents on and around your infrastructure and are looking for solutions, please get in touch: enquiries@engineeringcsl.com

Leave a Comment